Kitchens Direct update
The fitter worked all day yesterday and the cupboards arrived. I still have no floor, sink, oven, wall tiles but I have a work-surface and some cupboards without doors. And a kettle and a toaster.
Miff is enjoying climbing on all the boxes. The fish are less impressed, they are walled in and can only see out of one side of their tank.
J is off on a stag do all day and will probably fall through the door at 3am. So it seems like a great excuse to take myself out for the day: gym, swim, movie, sushi and then down the pub with my friends in the evening.
Miff is enjoying climbing on all the boxes. The fish are less impressed, they are walled in and can only see out of one side of their tank.
J is off on a stag do all day and will probably fall through the door at 3am. So it seems like a great excuse to take myself out for the day: gym, swim, movie, sushi and then down the pub with my friends in the evening.
Good for you. Your certainly need a break after all the stress about the kitchen.
Have a nice relaxing day - you defnitely deserve it.
Have fun...
^Thank you!
Just blogged about my Kitchens Direct experience. I think that, as they sub-contract all the work out, it seems to be a bit luck of the draw.
I can't fault their customer service dept. mind you. Hope they get it finished soon!